• Skip to content
  • Skip to main navigation
RICS logo RICS iSurv logo isurv international
Channels Show the navigation
  • APC and AssocRICS
  • Construction
  • Infrastructure
  • Professional conduct
  • Valuation
You are here:
  1. Home
  2. Channels
  3. Infrastructure
  4. Cost management
  5. Conceptual cost planning for infrastructure

Conceptual cost planning for infrastructure

Information on Conceptual cost planning for infrastructure

  • Building up the cost estimate
  • Introduction
  • Significance of infrastructure to the UK
  • Summary
  • ‘Hard’ and ‘soft’ infrastructure
  • Resources

    Related resources

    Resources

    • RICS standards and guidance
    Close tab
  • Feedback

    Give us your feedback on isurv international

    Feedback

    • test
    Close tab
  • Introduction
  • Significance of infrastructure to the UK
  • Building up the cost estimate

    +

    • Overview
    • Stage 1: base cost estimate
    • Stage 2: adjusting for risk
    • The process of risk management
    • Risk analysis
    • Stage 3: towards a final estimate – managing the cost
  • Summary
  • ‘Hard’ and ‘soft’ infrastructure
RICS logo RICS iSurv logo isurv
  • © 2025 isurv

  • About
  • Contact
  • Help
  • Accessibility
  • Terms and Conditions
  • Privacy Policy

Suppliers

  • Designed and Powered by Jadu.
  • Twitter
  • LinkedIn